Sign In | Join Free | My wpc-board.com
China Guangzhou Jet Scaffold & Formwork System Co., Ltd. logo
Guangzhou Jet Scaffold & Formwork System Co., Ltd.
Guangzhou Jet Scaffold & Formwork System Co., Ltd. Quality is the future
Active Member

4 Years

Home > Cuplock Scaffolding System >

Strong Load Cuplock Formwork System 48.3-48.6 Mm Diameter Energy Saving For Construction

Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Strong Load Cuplock Formwork System 48.3-48.6 Mm Diameter Energy Saving For Construction

Brand Name : JET

Model Number : Cuplock scaffold

Certification : SGS/EN12810

Place of Origin : Guangzhou

MOQ : 5 Tons

Price : negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 10000 Tons / Month

Delivery Time : 15 work days

Packaging Details : 1. Scaffolding Frame is bare package , loading in containr 2. In pallet 3. As you required

Material : Q235

Surface treatment : Painted

Advantage : Bearing Capacity

Certificate : SGS/EN12810

Thickness : 3.0-3.5 mm

Diameter : 48.3-48.6mm

Color : Red

Application : Building construction

Item : Cuplock Parts

Standard : British standard scaffolding

Contact Now

Strong Load Capacity Scaffolding Cuplock System For Construction With High Materials Standard Cuplock Scaffold


Product Description


Standard:


Length(M)Weight(KG)
Self finishPaintedHot galvanized
L=0.502.422.52.57
L=1.004.844.985.13
L=1.306.546.746.93
L=1.507.257.477.69
L=1.808.969.229.49
L=2.009.679.9610.25
L=2.3011.3711.7112.05
L=2.5012.0812.4412.81
L=3.0014.514.9315.37

Ledger:


Length(M)Weight(KG)
Self finishPaintedHot galvanized
L=0.602.382.452.52
L=0.903.443.553.65
L=1.003.83.914.03
L=1.204.514.654.78
L=1.304.875.015.16
L=1.509.675.755.91
L=1.8011.376.857.05
L=2.0012.087.587.8
L=2.5014.59.419.69

Intermediate transom:


Length(M)Weight(KG)
Self finishPaintedHot galvanized
L=0.602.382.452.52
L=0.903.443.553.65
L=1.003.83.914.03
L=1.204.514.654.78
L=1.304.875.015.16
L=1.505.585.755.91
L=1.806.656.857.05
L=2.007.367.587.8
L=2.509.149.419.69

NameLengthWeight (Kg)
Self FinishPaintedHot Dip Galvanized
Diagonal BraceL=0.60Mt3.593.73.8
Diagonal BraceL= 1.3Mt5.225.375.53
Diagonal BraceL= 1.8Mt7.487.717.93
Spigot ConnectorL=0.25Mt0.690.710.73

Our Advantage



1. Energy saving and environmental protection, save 2/3 steel than bowl button scaffolding .


2. Hot dip galvanizing process, the service life for more than 15 years.


3. New carbon steel, high strength mechanical properties, pole load up to 200KN.


4. Gravity self-locking,can prevent ledger slippage effectively,make the construction more safety.


5. Easy to remove the tower, save time and effort, the tower speed of the steel pipe fastener scaffolding 4 to 8 times, for the bowl buckle scaffolding 2 times.


6. Standard modules, efficient management, easy to transport and construction management, reduce the risk of loss damage.


Product photos






Our Company

JET has been established in Guangzhou,China.

We offer services with material of high standard undisputed quality services with competitive rates.and we provide complete solutions of scaffolding and formwork system to the construction industry.

Our varied products mix of Ringlock system,Frame system,Steel plank,Steel prop,Scaffolding pipe and all kind of couplers, with high quality for commercial and industrial construction industries.

Many of our client base are returning customers whom we have known and worked for many years.

Our products have enjoyed great popular at home and abroad,Such as America,Australia,Europe,the Middle east and so on.


FAQ


1. Question: What's your MOQ(minimum order quantity)?

Answer: One full container.


2. Question: What's your packing methods?

Answer: Packed into bundle, and rest in bulk.


3. Question: What's your payment terms?

Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status.


4. Question: What's your delivery time?

Answer: 10-20 days after received the advance payment or L/C.


5. Question: Are you manufacturer or trader?

Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.


6. Question: Where's your factory?

Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.


7. Question: Can we visit your factory?

Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.


8. Question: Can you supply other scaffolding materials?

Answer: Yes. All related scaffolding materials.

(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

(4) steel coupler (preesed / drop forged coupler)

(5) steel plank with hooks or without hooks

(6) steel stair case


Product Tags:

cuplock formwork system

      

cuplock shuttering system

      
Wholesale Strong Load Cuplock Formwork System 48.3-48.6 Mm Diameter Energy Saving For Construction from china suppliers

Strong Load Cuplock Formwork System 48.3-48.6 Mm Diameter Energy Saving For Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Jet Scaffold & Formwork System Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)